Project description
The project comprised replacing two commercial gas fired condensing boilers and a dated boiler room control panel. The old boilers were replaced with two new Potterton Paramount 5 gas fired condensing boilers complete with new stainless steel flue systems. The old control panel was then replaced with a new control panel incorporating a boiler management system (BMS) and combined natural gas / carbon monoxide alarm.